0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

Life-Cycle cost-benefit analysis of Bridge deck de-icing using geothermal heat pump system: A case study of North Texas

This publication has been cited in the following 2 other publication(s):

  • About this
    data sheet
  • Reference-ID
    10559014
  • Published on:
    02/02/2021
  • Last updated on:
    19/02/2021
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine