0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

Lessons Learned from Construction of Shanghai Metro Stations: Importance of Quick Excavation, Prompt Propping, Timely Casting, and Segmented Construction

Author(s):



Medium: journal article
Language(s): English
Published in: Journal of Performance of Constructed Facilities (ASCE), , n. 4, v. 29
Page(s): 04014096
DOI: 10.1061/(asce)cf.1943-5509.0000599

Structures and Projects

Geographic Locations

Structurae cannot make the full text of this publication available at this time. The full text can be accessed through the publisher via the DOI: 10.1061/(asce)cf.1943-5509.0000599.
  • About this
    data sheet
  • Reference-ID
    10192717
  • Published on:
    02/12/2018
  • Last updated on:
    02/12/2018
 
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine