Author(s): |
L. N. Zhuravov
O. I. Chemerinsky V. A. Seliverstov |
---|---|
Medium: | journal article |
Language(s): | English |
Published in: | Structural Engineering International, August 1996, n. 3, v. 6 |
Page(s): | 183-186 |
DOI: | 10.2749/101686696780495527 |
Abstract: |
This paper presents some typical design and construction practices in Russia for the erection of steel bridge superstructures by incremental launching. These practices have been developed over the past twenty years at construction sites in Russia and other republics of the former USSR. |