0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

Last Planner System Framework to Assess Planning Reliability in Architectural Design

This publication lists 57 references to other publication(s):

  • About this
    data sheet
  • Reference-ID
    10744402
  • Published on:
    28/10/2023
  • Last updated on:
    07/02/2024
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine