0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

The Last Planner System as an Emergent Production Planning and Control Method: The Role of Multiple Representations

This publication lists 76 references to other publication(s):

  • About this
    data sheet
  • Reference-ID
    10791267
  • Published on:
    01/09/2024
  • Last updated on:
    01/09/2024
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine