Last Planner Control System Applied to a Chemical Plant Construction
Author(s): |
A. Nieto-Morote
F. Ruz-Vila |
---|---|
Medium: | journal article |
Language(s): | English |
Published in: | Journal of Construction Engineering and Management, February 2012, n. 2, v. 138 |
Page(s): | 287-293 |
DOI: | 10.1061/(asce)co.1943-7862.0000415 |
- About this
data sheet - Reference-ID
10166215 - Published on:
02/12/2018 - Last updated on:
02/12/2018