Kopswerk II headrace tunnel - construction of the pressure tunnel and associated works / Triebwasserstollen Kopswerk II - Bauarbeiten Druckstollen und Nebenanlagen

Author(s):

Medium: journal article
Language(s): English, German
Published in: Geomechanics and Tunnelling, , n. 2, v. 4
Page(s): 103-118
DOI: 10.1002/geot.201100009
Abstract:

The article concerns the construction of the Kopswerk II pressure tunnel and associated works. Important details of the construction and construction sequence are described, particularly the logistics of a large site in the high mountains. In addition to a summary of the various drill and blast tunnels, the article concentrates on the TBM drive and the drilling and grouting works in the pressure tunnel.
Der Beitrag befasst sich mit den Bauarbeiten für den Druckstollen des Kopswerkes II und dessen Nebenanlagen. Dabei werden die Eckpfeiler der Bauausführung und des Bauablaufes, insbesondere auch die Logistik einer Baustelle im Hochgebirge beschrieben. Neben einem Abriss über die verschiedenen Sprengvortriebe wird vor allem über den TBM-Vortrieb und die Bohr- und Injektionsarbeiten im Druckstollen berichtet.

Keywords:
backfilling intake structure headrace tunnel intake area building site facilities construction site and access raise boring Alimak drive grouting works pressure tunnels headrace tunnels
Available from: Refer to publisher

Structure Types

Structurae cannot make the full text of this publication available at this time. The full text can be accessed through the publisher via the DOI: 10.1002/geot.201100009.
  • About this
    data sheet
  • Reference-ID
    10064991
  • Published on:
    22/06/2011
  • Last updated on:
    13/08/2014
 
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine