Kopswerk II headrace tunnel - construction of the pressure tunnel and associated works / Triebwasserstollen Kopswerk II - Bauarbeiten Druckstollen und Nebenanlagen
Author(s): |
Herbert Schnetzer
Reinhold Gerstner |
---|---|
Medium: | journal article |
Language(s): | English, German |
Published in: | Geomechanics and Tunnelling, 2011, n. 2, v. 4 |
Page(s): | 103-118 |
DOI: | 10.1002/geot.201100009 |
Abstract: |
The article concerns the construction of the Kopswerk II pressure tunnel and associated works. Important details of the construction and construction sequence are described, particularly the logistics of a large site in the high mountains. In addition to a summary of the various drill and blast tunnels, the article concentrates on the TBM drive and the drilling and grouting works in the pressure tunnel. |
Keywords: |
backfilling intake structure headrace tunnel intake area building site facilities construction site and access raise boring Alimak drive grouting works pressure tunnels headrace tunnels
|
Available from: | Refer to publisher |