Knowledge-Based Standard Progress Measurement for Integrated Cost and Schedule Performance Control
Author(s): |
Youngsoo Jung
Seunghee Kang |
---|---|
Medium: | journal article |
Language(s): | English |
Published in: | Journal of Construction Engineering and Management, January 2007, n. 1, v. 133 |
Page(s): | 10-21 |
DOI: | 10.1061/(asce)0733-9364(2007)133:1(10) |
- About this
data sheet - Reference-ID
10162514 - Published on:
07/12/2018 - Last updated on:
07/12/2018