0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

A knowledge-based approach to support the generation of construction schedules

Author(s):


Medium: journal article
Language(s): English
Published in: Computers & Structures, , n. 1, v. 40
Page(s): 59-66
DOI: 10.1016/0045-7949(91)90457-w
Structurae cannot make the full text of this publication available at this time. The full text can be accessed through the publisher via the DOI: 10.1016/0045-7949(91)90457-w.
  • About this
    data sheet
  • Reference-ID
    10276766
  • Published on:
    05/01/2019
  • Last updated on:
    05/01/2019
 
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine