0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

Key Techniques for the Main Navigable Bridge of the Main Passageway of Ningbo–Zhoushan Port

Author(s): ORCID (Zhejiang Provincial Institute of Communications Planning, Design & Research CO., LTD., Hangzhou, People’s Republic of China)
(Zhejiang Provincial Institute of Communications Planning, Design & Research CO., LTD., Hangzhou, People’s Republic of China)
(China Communications Highway Planning and Design Institute Co., Ltd., Beijing, People’s Republic of China)
(China Communications Highway Planning and Design Institute Co., Ltd., Beijing, People’s Republic of China)
Medium: journal article
Language(s): English
Published in: Structural Engineering International, , n. 2, v. 32
Page(s): 1-6
DOI: 10.1080/10168664.2021.1975345
Structurae cannot make the full text of this publication available at this time. The full text can be accessed through the publisher via the DOI: 10.1080/10168664.2021.1975345.
  • About this
    data sheet
  • Reference-ID
    10635918
  • Published on:
    30/11/2021
  • Last updated on:
    08/06/2023
 
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine