0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

Key Construction Technology of HuSuTong Yangtze River Bridge

Author(s): (China Railway Major Bridge Reconnaissance & Design Group Co., Ltd., Wuhan, People’s Republic of China)
(China Railway Major Bridge Reconnaissance & Design Group Co., Ltd., Wuhan, People’s Republic of China)
(China Railway Major Bridge Reconnaissance & Design Group Co., Ltd., Wuhan, People’s Republic of China)
(China Railway Major Bridge Reconnaissance & Design Group Co., Ltd., Wuhan, People’s Republic of China)
(China Railway Major Bridge Reconnaissance & Design Group Co., Ltd., Wuhan, People’s Republic of China)
Medium: journal article
Language(s): English
Published in: Structural Engineering International, , n. 1, v. 33
Page(s): 1-5
DOI: 10.1080/10168664.2021.1991252
Structurae cannot make the full text of this publication available at this time. The full text can be accessed through the publisher via the DOI: 10.1080/10168664.2021.1991252.
  • About this
    data sheet
  • Reference-ID
    10647695
  • Published on:
    10/01/2022
  • Last updated on:
    08/06/2023
 
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine