Key Constraints Analysis with Integrated Production Scheduler
Author(s): |
D. K. Chua
L. J. Shen |
---|---|
Medium: | journal article |
Language(s): | English |
Published in: | Journal of Construction Engineering and Management, July 2005, n. 7, v. 131 |
Page(s): | 753-764 |
DOI: | 10.1061/(asce)0733-9364(2005)131:7(753) |
- About this
data sheet - Reference-ID
10156060 - Published on:
07/12/2018 - Last updated on:
07/12/2018