Key BIM Adoption Drivers to Improve Performance of Infrastructure Projects in the Ethiopian Construction Sector: A Structural Equation Modeling Approach
Author(s): |
Solomon Belay
James Goedert Asregedew Woldesenbet Saeed Rokooei José Matos Helder Sousa |
---|---|
Medium: | journal article |
Language(s): | English |
Published in: | Advances in Civil Engineering, January 2021, v. 2021 |
Page(s): | 1-12 |
DOI: | 10.1155/2021/7473176 |
Abstract: |
The aim of this paper is to explore the critical BIM adoption drivers across the Ethiopian public infrastructure construction sector. In this regard, a comprehensive systematic literature review was employed to identify potential BIM implementation attributes in developing countries and validated through a pilot test. Then, quantitative data was collected from experts working in various organizations using a structured questionnaire survey. A structural equation model was then developed based on five key BIM adoption constructs and 14 adoption drivers. Based on the path analysis, Application, Environment, and Project related factors positively affect BIM adoption in infrastructure projects, whereas Organization and Information Management are insignificant and negatively affect BIM adoption in the Ethiopian construction industry. The study highlighted key BIM adoption attributes that are helpful to enhance the overall project management performance in infrastructure projects. The proposed action plan is beneficial to various professionals, government, and stakeholders in an effort to improve the current level of BIM uptake in the horn of Africa. More so, the findings of this paper can be used to facilitate and promote BIM adoption in public infrastructure construction projects across the Ethiopian construction market. |
Copyright: | © 2021 Solomon Belay et al. |
License: | This creative work has been published under the Creative Commons Attribution 4.0 International (CC-BY 4.0) license which allows copying, and redistribution as well as adaptation of the original work provided appropriate credit is given to the original author and the conditions of the license are met. |
1.43 MB
- About this
data sheet - Reference-ID
10630563 - Published on:
01/10/2021 - Last updated on:
17/02/2022