Die Kanalbrücke über die Rednitz bei Fürth im Zuge des Main-Donau-Kanals
Author(s): |
Kuhn
Holz Freudenberg Geldmacher |
---|---|
Medium: | journal article |
Language(s): | German |
Published in: | Stahlbau, July 1972, n. 7, v. 41 |
Page(s): | 193-198 |
Keywords: |
fabrication pier assembly substructures trough sealing calculation pile foundation hydraulic steel structures
|
Available from: | Refer to publisher |