0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

Die Kanalbrücke über die Elbe (Teil 3)

Bauausführung

Author(s):



Medium: journal article
Language(s): German
Published in: Stahlbau, , n. 8, v. 70
Page(s): 554-558
DOI: 10.1002/stab.200101980
Abstract:

Im Teil 3 dieses Beitrags wird die Fertigung und Montage des Stahlüberbaus der Strom- und Vorlandbrücke beschrieben.

Keywords:
fabrication assembly transportation
Available from: Refer to publisher

Structures and Projects

Structure Types

Structurae cannot make the full text of this publication available at this time. The full text can be accessed through the publisher via the DOI: 10.1002/stab.200101980.
  • About this
    data sheet
  • Reference-ID
    10012425
  • Published on:
    09/12/2003
  • Last updated on:
    30/09/2018
 
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine