線路直下を長距離横断する非開削工法によるボックスカルバートの施工(JR東海道線吹田貨物専用道路Bv工事) (The Construction of the Box Culvert by Using Non-Open Cut Method under the Railway [JR Tokaido Line Suita Freight-Only Road Over Bridge Construction])
Author(s): |
M. Fukyo
S. Aihara |
---|---|
Medium: | journal article |
Language(s): | Japanese |
Published in: | Concrete Journal (JCI), 2016, n. 9, v. 54 |
Page(s): | 876-882 |
DOI: | 10.3151/coj.54.9_876 |
- About this
data sheet - Reference-ID
10437778 - Published on:
08/10/2020 - Last updated on:
21/03/2023