0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

暑中時の合成短繊維混入コンクリートを用いた鉄道高架橋工事─JR新水前寺駅地区交通結節点改善事業─ (Railway Viaduct Construction using Fiber Reinforced Concrete which is Poured in Hot Weather—An Improvement Project of a Traffic Connection in Shin-Suizenji-Station Area—)

Author(s):


Medium: journal article
Language(s): Japanese
Published in: Concrete Journal (JCI), , n. 6, v. 49
Page(s): 6_26-6_32
DOI: 10.3151/coj.49.6_26
Structurae cannot make the full text of this publication available at this time. The full text can be accessed through the publisher via the DOI: 10.3151/coj.49.6_26.
  • About this
    data sheet
  • Reference-ID
    10438774
  • Published on:
    08/10/2020
  • Last updated on:
    08/10/2020
 
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine