Joint operation of parallel reservoir with interconnected tunnel

Author(s):



Medium: journal article
Language(s): English
Published in: IOP Conference Series: Materials Science and Engineering, , n. 1, v. 933
Page(s): 012032
DOI: 10.1088/1757-899x/933/1/012032
Abstract:

Reservoir operation is strongly influenced by water balance conditions in the catchment area. The amount of inflow, reservoir capacity, and water requirement are major factors in arranging the reservoir operation rules. The purpose of this research is to obtain the extent of the parallel reservoir operation reliability that performed simultaneously by utilizing water transfer from wet to dry watershed. Simulation method used to operate the parallel reservoir with interconnecting tunnel between. From simulated results on three seasons, there are obtained that the water potential to be transferred to the dry watershed. By utilizing this water potential, further simulation for 25 years will come to see the reliability of the joint operating rule in this location.

Structurae cannot make the full text of this publication available at this time. The full text can be accessed through the publisher via the DOI: 10.1088/1757-899x/933/1/012032.
  • About this
    data sheet
  • Reference-ID
    10675056
  • Published on:
    12/06/2022
  • Last updated on:
    12/06/2022
 