0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

IV Puente sobre el río Guadiana, en Badajoz. Instrumentación y control del atirantamiento

Author(s):

Medium: journal article
Language(s): Spanish
Published in: Hormigón y acero, , n. 206, v. 48
Page(s): 63-79
Abstract:

IV Cable-stayed bridge over Guadiana river in Badajoz. Measuring and supervision during the instalation of stay-cables

This paper describes the main items dealing with the process of putting in tension the stays of the forth bridge over the Guadiana River in Badajoz. It starts giving a brief overview on the cable-stayed bridge and its construction process, making a complete description of the different measuring devices and of the program specially designed for the bridge. At last, the work of inspection, supervision and evaluation carried out by the authors is established in detail.

Available from: ACHE - Asociación Española de Ingeniería Estructural

Structures and Projects

Structurae cannot make the full text of this publication available at this time.
  • About this
    data sheet
  • Reference-ID
    10075968
  • Published on:
    06/11/2018
  • Last updated on:
    06/11/2018
 
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine