0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

Is Deferrable Demand an Effective Alternative to Upgrading Transmission Capacity?

Author(s): (Assistant Professor, Lehigh Univ., 451 Rauch Center, Bethlehem, PA 18015 (corresponding author).)
(Professor, Cornell Univ., B41 Warren Hall, Ithaca, NY 14853.)
(Graduate Student, Cornell Univ., B30 Warren Hall, Ithaca, NY 14853.)
(Graduate Student, Cornell Univ., B30 Warren Hall, Ithaca, NY 14853.)
Medium: journal article
Language(s): English
Published in: Journal of Energy Engineering, , n. 1, v. 141
DOI: 10.1061/(asce)ey.1943-7897.0000182
Structurae cannot make the full text of this publication available at this time. The full text can be accessed through the publisher via the DOI: 10.1061/(asce)ey.1943-7897.0000182.
  • About this
    data sheet
  • Reference-ID
    10588261
  • Published on:
    08/03/2021
  • Last updated on:
    08/03/2021
 
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine