0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

An IPD-based incentive mechanism to eliminate change orders in construction projects in China

This publication lists 43 references to other publication(s):

  • About this
    data sheet
  • Reference-ID
    10172805
  • Published on:
    10/12/2018
  • Last updated on:
    10/12/2018
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine