0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

Investment valuation model for sustainable infrastructure systems

Mezzanine debt for water projects

Author(s):



Medium: journal article
Language(s): English
Published in: Engineering, Construction and Architectural Management, , n. 5, v. 26
Page(s): 850-884
DOI: 10.1108/ecam-03-2018-0095
Abstract:

Purpose

The purpose of this paper is to develop an investment valuation model using the mezzanine debt mechanism based on blue bonds that explicitly allude to public–private partnerships (P3s) and project finance (PF). Additionally, this study proposes the financial captured value (FCV) theory for measuring how much financial value lenders may capture by becoming sponsors through financing of sustainable infrastructure systems (SIS).

Design/methodology/approach

The investment valuation model was validated through the Aguas Claras wastewater treatment plant as a case study.

Findings

The empirical results show that lenders may capture financial value by converting outstanding debt into equity shares throughout the operation and maintenance stage. Furthermore, case study results provide new insights into the implications of the debt–equity conversion ratio on the relationship between the sponsors’ internal rate of return and the FCV.

Research limitations/implications

The most significant limitation is the lack of primary and secondary information on blue bonds. Thus, robust statistical analyses to contrast results were not possible.

Practical implications

Researchers and practising professionals can improve their understanding of how mezzanine debt, P3s and PF into an investment valuation model allows financing SIS using a non-conventional financial mechanism. The recommendations will benefit both the academia as well infrastructure industry in bridging the gap between design theory and practice.

Originality/value

Sustainability components have not been addressed explicitly or combined in the financing’s structuring. Therefore, the investment valuation model could be considered a novel methodology for decision making related to financing and investment of SIS.

Structurae cannot make the full text of this publication available at this time. The full text can be accessed through the publisher via the DOI: 10.1108/ecam-03-2018-0095.
  • About this
    data sheet
  • Reference-ID
    10576742
  • Published on:
    26/02/2021
  • Last updated on:
    26/02/2021
 
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine