Investment Probabilistic Interval Estimation for Construction Project Using the Hybrid Model of SVR and GWO
Author(s): |
Xiaobo Chen
Yuanyuan Zhang Binyan Zhao Shuting Yang |
---|---|
Medium: | journal article |
Language(s): | English |
Published in: | Journal of Construction Engineering and Management, May 2021, n. 5, v. 147 |
Page(s): | 04021031 |
DOI: | 10.1061/(asce)co.1943-7862.0002032 |
- About this
data sheet - Reference-ID
10577938 - Published on:
02/03/2021 - Last updated on:
02/03/2021