Investigations on the transient support pressure transfer at the tunnel face during slurry shield drive Part 2: Case B – Deep slurry penetration exceeds tool cutting depth
This publication has been cited in the following 7 other publication(s):
Advertisement
About this data sheet
Reference-ID 10637258
Published on: 30/11/2021
Last updated on: 30/11/2021
Advertisement
Structurae cooperates with
Advertisement
You have exceeded your monthly download limit!
Structurae Plus subscribers can download 30 media files or data sets per month.
Structurae Pro users are limited to 50.
Do you really want to delete this item from your favorites?
The item was successfuly added to the shopping cart.Could not add item to the shopping cart. Please try again.This item has already been added to the shopping cart and cannot be added again.