0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

Investigation on the Maximum Expansion Length of Urban Rail Transit Double-Tower Cable-Stayed Bridges Without Rail Expansion Device

Author(s): (School of Civil Engineering, Suzhou University of Science and Technology, 1701 Binhe Road, Suzhou 215011 P. R. China)
(Department of Bridge Engineering, Tongji University, 1239 Siping Road, Shanghai 200092, P. R. China)
(Department of Bridge Engineering, Tongji University, 1239 Siping Road, Shanghai 200092, P. R. China)
Medium: journal article
Language(s): English
Published in: International Journal of Structural Stability and Dynamics, , n. 14, v. 21
Page(s): 2140005
DOI: 10.1142/s0219455421400058
Structurae cannot make the full text of this publication available at this time. The full text can be accessed through the publisher via the DOI: 10.1142/s0219455421400058.
  • About this
    data sheet
  • Reference-ID
    10631392
  • Published on:
    01/10/2021
  • Last updated on:
    03/12/2021
 
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine