0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

Investigation on influence of tail void grouting on the surface settlements during shield tunneling using a stress-pore pressure coupled analysis

Author(s):

Medium: journal article
Language(s): English
Published in: KSCE Journal of Civil Engineering, , n. 3, v. 18
Page(s): 803-811
DOI: 10.1007/s12205-014-1383-8
Structurae cannot make the full text of this publication available at this time. The full text can be accessed through the publisher via the DOI: 10.1007/s12205-014-1383-8.
  • About this
    data sheet
  • Reference-ID
    10172096
  • Published on:
    04/12/2018
  • Last updated on:
    04/12/2018
 
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine