Investigation of Effects of Time Preference and Risk Perception on Life-Cycle Management of Civil Infrastructure
Author(s): |
Minghui Cheng
David Y. Yang Dan M. Frangopol |
---|---|
Medium: | journal article |
Language(s): | English |
Published in: | ASCE-ASME Journal of Risk and Uncertainty in Engineering Systems, Part A: Civil Engineering, March 2020, n. 1, v. 6 |
Page(s): | 04020001 |
DOI: | 10.1061/ajrua6.0001039 |
- About this
data sheet - Reference-ID
10519328 - Published on:
10/12/2020 - Last updated on:
19/02/2021