An investigation into cost overruns for ongoing building projects in Abuja, Nigeria
Author(s): |
Ibrahim Saidu
Winston Shakantu |
---|---|
Medium: | journal article |
Language(s): | English |
Published in: | Acta Structilia, June 2017, n. 1, v. 24 |
DOI: | 10.18820/24150487/as24i1.3 |
Geographic Locations
- About this
data sheet - Reference-ID
10411798 - Published on:
12/02/2020 - Last updated on:
12/02/2020