0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

Investigation, assessment, strategy for deck widening of existing HWY PT bridges

Author(s): (TECNE Milan Italy)
(TECNE Milan Italy)
(ASPI Rome Italy)
(ASPI Rome Italy)
Medium: journal article
Language(s): English
Published in: ce/papers, , n. 5, v. 6
Page(s): 18-27
DOI: 10.1002/cepa.2041
Abstract:

Autostrade per l'Italia (ASPI) is planning the upgrading of several highway axis for approx. 150 km in the next years. Most of the original bridges, built around ‘60/‘70, have already been widened in the 90s but should now be widened again. The original decks are often made of a grid of post‐tensioned elements, while the further enlargements were built with different solutions (precast pre‐stressed beams or steel beams).

To assess the material properties and the internal conditions of the post‐tensioned decks, several investigations with non‐destructive and semi‐destructive testing have been carried out, in accordance with Italian Guidelines.

This paper illustrates the main results collected, also highlighting the difficulties encountered to achieve a sufficient understanding of the degradation conditions. The assessment process evidenced that for a large part of the post‐tensioned decks it was more convenient to intervene with the replacement of the existing decks rather than rehabilitate them. The main reasons supporting this choice are explained.

Structurae cannot make the full text of this publication available at this time. The full text can be accessed through the publisher via the DOI: 10.1002/cepa.2041.
  • About this
    data sheet
  • Reference-ID
    10767311
  • Published on:
    17/04/2024
  • Last updated on:
    17/04/2024
 
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine