0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

Investigation and Prioritization of Railway Reconstruction Projects by Using Analytic Hierarchy Process Approach Case Study: Kerman and Southeastern Areas in Iranian Railways

Structurae cannot make the full text of this publication available at this time. The full text can be accessed through the publisher via the DOI: 10.3311/ppci.19543.
  • About this
    data sheet
  • Reference-ID
    10665129
  • Published on:
    09/05/2022
  • Last updated on:
    27/09/2022
 
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine