0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

Introducción al proyecto del puente de Messina

Author(s):
Medium: journal article
Language(s): Spanish
Published in: Hormigón y acero, , n. 246, v. 58
Page(s): 33-47
Abstract:

Introduction to the project of the Messina Bridge

At the end of 2005, the joint venture from which Sacyr is partner presented the best technical and economical offer for the construction of the Messina Bridge (Italy). The tender budget was 4.400 millions of euros. This paper describes the different stages of development of this huge project. First of all, the reasons to select a suspension bridge instead of a deep tunnel or a float one are analysed. After that, the different possibilities for the bridge solution are commented (place, number of spans?). Finally, the tender project is described briefly, with special focus on the improvements presented in this phase for the Sacyr?s group.

Available from: ACHE - Asociación Española de Ingeniería Estructural

Structures and Projects

Structurae cannot make the full text of this publication available at this time.
  • About this
    data sheet
  • Reference-ID
    10075630
  • Published on:
    11/10/2018
  • Last updated on:
    11/10/2018
 
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine