0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

Interval Grey Fuzzy Uncertain Linguistic Sets and Their Application to Ranking of Construction Project Risk Factors

Author(s): (School of Economics and Management, Chongqing Jiaotong Univ., Chongqing 400074, China (corresponding author).)
(School of Economics and Management, Chongqing Jiaotong Univ., Chongqing 400074, China.)
(School of Economics and Management, Chongqing Jiaotong Univ., Chongqing 400074, China.)
Medium: journal article
Language(s): English
Published in: Journal of Highway and Transportation Research and Development (English Edition), , n. 2, v. 12
Page(s): 73-80
DOI: 10.1061/jhtrcq.0000628
Structurae cannot make the full text of this publication available at this time. The full text can be accessed through the publisher via the DOI: 10.1061/jhtrcq.0000628.
  • About this
    data sheet
  • Reference-ID
    10589464
  • Published on:
    08/03/2021
  • Last updated on:
    19/04/2023
 
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine