0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

Intelligent monitoring and evaluation for the prefabricated construction schedule

This publication lists 52 references to other publication(s):

  • About this
    data sheet
  • Reference-ID
    10663262
  • Published on:
    09/05/2022
  • Last updated on:
    20/02/2023
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine