Integriertes Rheinprogramm — Einlassbauwerk zum Hochwasserschutz
Author(s): |
Werner Schadwinkel
Bernhard Sandmann Bernhard Lonsdorfer |
---|---|
Medium: | journal article |
Language(s): | German |
Published in: | Bautechnik, August 2015, n. 8, v. 92 |
Page(s): | 564-568 |
DOI: | 10.1002/bate.201500061 |
Abstract: |
The Integrated Rhine Program structure for a flood retention basinThis report deals with the essential planning details of a new intake structure for a flood retention basin in the regulated area of the Rhine, as well as with the collaboration between hydraulic, structural and soil engineers. The particular position of the structure places high demands on various factors, ranging from flood safety, the safety of the excavation pit in the dam, which is also under strain from the pressure of the water, right up to safe energy conversion downstream from the structure. The structure is currently under construction and a fish pass is also being incorporated in it. |
Keywords: |
earthquake verification flood protection intake structure pilot trial dam safety earthquake proof excavation enclosure energy conversion fish passes model test
|
Available from: | Refer to publisher |
- About this
data sheet - Reference-ID
10072055 - Published on:
28/09/2015 - Last updated on:
13/08/2019