0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

Integration of four-dimensional computer-aided design modeling and three-dimensional animation of operations simulation for visualizing construction of the main stadium for the Beijing 2008 Olympic games

Structurae cannot make the full text of this publication available at this time. The full text can be accessed through the publisher via the DOI: 10.1139/l08-145.
  • About this
    data sheet
  • Reference-ID
    10137579
  • Published on:
    03/12/2018
  • Last updated on:
    03/12/2018
 
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine