Integration of four-dimensional computer-aided design modeling and three-dimensional animation of operations simulation for visualizing construction of the main stadium for the Beijing 2008 Olympic games
Author(s): |
Ming Lu
Yang Zhang Jianping Zhang Zhenzhong Hu Jiulin Li |
---|---|
Medium: | journal article |
Language(s): | English |
Published in: | Canadian Journal of Civil Engineering / Revue canadienne de génie civil, March 2009, n. 3, v. 36 |
Page(s): | 473-479 |
DOI: | 10.1139/l08-145 |
- About this
data sheet - Reference-ID
10137579 - Published on:
03/12/2018 - Last updated on:
03/12/2018