0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

Integrating the multi-objective elephant herding optimization based time–cost trade-off model with earned value management

This publication lists 42 references to other publication(s):

  • About this
    data sheet
  • Reference-ID
    10709230
  • Published on:
    21/03/2023
  • Last updated on:
    21/03/2023
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine