0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

An integrated risk prioritization and determination of activity-wise delay (IRPAD) framework for enhancing schedule management in tunnel projects

This publication lists 46 references to other publication(s):

  • About this
    data sheet
  • Reference-ID
    10811835
  • Published on:
    17/01/2025
  • Last updated on:
    17/01/2025
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine