0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

An integrated quay crane - shuttle vehicle scheduling problem with apron buffer capacity constraints

Author(s): (School of Economics &Management, Shanghai Maritime University, Shanghai, China)
(College of Transportation Engineering, Chang'an University, Xi'an, Shaanxi, China)
(School of Economics &Management, Shanghai Maritime University, Shanghai, China)
(College of Transport & Communications, Shanghai Maritime University, Shanghai, China)
Medium: journal article
Language(s): English
Published in: Proceedings of the Institution of Civil Engineers - Maritime Engineering, , n. 4, v. 175
Page(s): 1-41
DOI: 10.1680/jmaen.2021.007
Structurae cannot make the full text of this publication available at this time. The full text can be accessed through the publisher via the DOI: 10.1680/jmaen.2021.007.
  • About this
    data sheet
  • Reference-ID
    10688227
  • Published on:
    13/08/2022
  • Last updated on:
    20/02/2023
 
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine