Integrated project team performance in early design stages – performance indicators influencing effectiveness in bridge design
Author(s): |
Daniel Ekström
Rasmus Rempling Mario Plos |
---|---|
Medium: | journal article |
Language(s): | English |
Published in: | Architectural Engineering and Design Management, December 2018, n. 4, v. 15 |
Page(s): | 249-266 |
DOI: | 10.1080/17452007.2018.1563521 |
- About this
data sheet - Reference-ID
10301681 - Published on:
29/06/2019 - Last updated on:
01/07/2019