Integrated Project Delivery Implementation Challenges in the Construction Industry
Author(s): |
Zahra Kahvandi
Ehsan Saghatforoush Ahad ZareRavasan Christopher Preece |
---|---|
Medium: | journal article |
Language(s): | English |
Published in: | Civil Engineering Journal, 21 August 2019, n. 8, v. 5 |
Page(s): | 1672-1683 |
DOI: | 10.28991/cej-2019-03091362 |
Abstract: |
Huge financial resources are spent in the construction industry all over the world, which are frequently wasted largely due to a lack of proper planning. In recent decades, in an attempt to overcome challenges, various contractual and administrative systems have been used by construction owners/clients. One such system has been Integrated Project Delivery (IPD). Its implementation has, however, experienced drawbacks. Identifying such drawbacks is an initial step in attempting to resolve them, and this paper aims to identify and prioritize the IPD implementation drawbacks in the context of the Iranian construction industry. A comprehensive list of IPD implementation drawbacks is prepared using a questionnaire survey. An in-depth literature review of the IPD concept has been combined with a review of various case studies applying the IPD system. The results were analyzed using the Robust Exploratory Factor Analysis (EFA) method. 22 drawbacks in the Construction Industry were categorized under four themes; contractual, environmental, managerial, and technical. Results show that contractual drawbacks are the most significant. The implication of this research is that identifying and classifying IPD implementation drawbacks provides a useful reference to managers and owners of the construction industry, for identifying and codifying solutions to overcome them. |
Copyright: | © 2019 Zahra Kahvandi, Ehsan Saghatforoush, Ahad ZareRavasan, Christopher Preece |
License: | This creative work has been published under the Creative Commons Attribution 4.0 International (CC-BY 4.0) license which allows copying, and redistribution as well as adaptation of the original work provided appropriate credit is given to the original author and the conditions of the license are met. |
0.61 MB
- About this
data sheet - Reference-ID
10365135 - Published on:
24/08/2019 - Last updated on:
02/06/2021