0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

Integrated Planning and Operation of Bus Bridging Evacuation for Metro Rail Disruption

Author(s): (Associate Professor, College of Urban Railway Transportation, Shanghai Univ. of Engineering Science, Longteng Rd., Shanghai 201620, P. R. China.)
ORCID (Associate Professor, College of Transport and Communications, Shanghai Maritime Univ., 1550 Haigang Avenue, Shanghai 201306, P. R. China (corresponding author))
(Professor, College of Urban Railway Transportation, Shanghai Univ. of Engineering Science, Longteng Rd., Shanghai 201620, P. R. China.)
Medium: journal article
Language(s): English
Published in: Journal of Urban Planning and Development, , n. 4, v. 146
Page(s): 04020048
DOI: 10.1061/(asce)up.1943-5444.0000625
Structurae cannot make the full text of this publication available at this time. The full text can be accessed through the publisher via the DOI: 10.1061/(asce)up.1943-5444.0000625.
  • About this
    data sheet
  • Reference-ID
    10587655
  • Published on:
    08/03/2021
  • Last updated on:
    08/03/2021
 
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine