0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

An Integrated Model for Multi-Mode Resource-Constrained Multi-Project Scheduling Problems Considering Supply Management with Sustainable Approach in the Construction Industry under Uncertainty Using Evidence Theory and Optimization Algorithms

This page can only be viewed if you are logged in. If you do not have an account yet, you can register here for My Structurae completely free of charge.

My Structurae