0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

Integrated duration–cost influence network for modelling risk impacts on construction tasks

Author(s):

Medium: journal article
Language(s): English
Published in: Construction Management and Economics, , n. 8, v. 24
Page(s): 861-868
DOI: 10.1080/01446190600658891
Structurae cannot make the full text of this publication available at this time. The full text can be accessed through the publisher via the DOI: 10.1080/01446190600658891.
  • About this
    data sheet
  • Reference-ID
    10210368
  • Published on:
    05/12/2018
  • Last updated on:
    05/12/2018
 
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine