0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

Integración de las metodologías Building Information Modeling 5D y Earned Value Management a través de una herramienta computacional

Author(s):


Medium: journal article
Language(s): English
Published in: Revista Ingeniería de Construcción, , n. 3, v. 33
Page(s): 263-278
DOI: 10.4067/s0718-50732018000300263
Copyright: © 2018 C. Cárdenas-Jiménez, P. Zapata-Rozo, N. Lozano-Ramírez
License:

This creative work has been published under the Creative Commons Attribution 4.0 International (CC-BY 4.0) license which allows copying, and redistribution as well as adaptation of the original work provided appropriate credit is given to the original author and the conditions of the license are met.

  • About this
    data sheet
  • Reference-ID
    10320594
  • Published on:
    12/07/2019
  • Last updated on:
    02/06/2021
 
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine