0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

Installation procedure for in-situ melted-soil piles using a low-temperature plasma generator

Author(s):

Medium: journal article
Language(s): English
Published in: Soil Mechanics and Foundation Engineering, , n. 6, v. 36
Page(s): 217-222
DOI: 10.1007/bf02471287
Structurae cannot make the full text of this publication available at this time. The full text can be accessed through the publisher via the DOI: 10.1007/bf02471287.
  • About this
    data sheet
  • Reference-ID
    10213552
  • Published on:
    04/12/2018
  • Last updated on:
    04/12/2018
 
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine