0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

innovative method of upgrading old rail tunnels under continued operation - Example Rekawinkler- and Kleiner Dürreberg Tunnel

Author(s):


Medium: journal article
Language(s): English
Published in: Geomechanics and Tunnelling, , n. 5, v. 10
Page(s): 533-541
DOI: 10.1002/geot.201700030
Structurae cannot make the full text of this publication available at this time. The full text can be accessed through the publisher via the DOI: 10.1002/geot.201700030.
  • About this
    data sheet
  • Reference-ID
    10084108
  • Published on:
    09/10/2018
  • Last updated on:
    18/10/2018
 
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine