Innovative Cautious Blasting Technique for Excavation Close to a Running Hydro-electric Powerhouse - a Case Study.
Author(s): |
A. K. Chakraborty
V. M. S. R. Murthy J. L. Jethwa |
---|---|
Medium: | journal article |
Language(s): | English |
Published in: | Proceedings of the Institution of Civil Engineers - Geotechnical Engineering, January 1996, n. 1, v. 119 |
Page(s): | 57-63 |
DOI: | 10.1680/igeng.1996.28136 |
- About this
data sheet - Reference-ID
10555654 - Published on:
24/01/2021 - Last updated on:
19/02/2021