0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

Ingenieure ohne Grenzen - 2 Brücken in 3 Monaten

Author(s):
Medium: journal article
Language(s): German
Published in: Stahlbau, , n. 2, v. 76
Page(s): 143-145
DOI: 10.1002/stab.200790011
Available from: Refer to publisher

Companies

Structurae cannot make the full text of this publication available at this time. The full text can be accessed through the publisher via the DOI: 10.1002/stab.200790011.
  • About this
    data sheet
  • Reference-ID
    10028838
  • Published on:
    16/08/2007
  • Last updated on:
    15/08/2014
 
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine