Information feedback and bidders’ competitiveness in construction bidding
Author(s): |
Bee Lan Oo
Florence Yean Yng Ling Alexander Soo |
---|---|
Medium: | journal article |
Language(s): | English |
Published in: | Engineering, Construction and Architectural Management, September 2014, n. 5, v. 21 |
Page(s): | 571-585 |
DOI: | 10.1108/ecam-04-2013-0037 |
Abstract: |
PurposeContractors rely on effective pricing methods in order to translate potential business into reality for long-term survival of their firms. This involves effective utilization of bidding feedback information toward winning jobs with high profit potential. The purpose of this paper is to experimentally investigate student (inexperienced) bidders’ competitiveness under full and partial information feedback conditions when the number of competing bidders is large (n=12). Design/methodology/approachThis paper adopted an experimental research design. The design used between-subjects variation and involved information feedback as the treatment variable with 120 students who enrolled in a cost-estimating course participated in the experiment. FindingsThe result shows that the variations in bids over time for both levels of information feedback are statistically significant. It is found that bidders with full bidding feedback information are more competitive than those with partial bidding feedback information. The bid-spread analysis and the identified effect of these two information feedback conditions on awarded contract sum, provide some further evidence that full information feedback condition would lead to lower average bids in construction bidding. Practical implicationsThe implication of the findings for construction clients is that they should provide as much bidding feedback information as possible so that the bid prices will be competitive. Originality/valueGiven the ambiguity inherent in field data, this paper provides strong justification of using experimental research design in advancing the understanding of construction pricing under different information feedback conditions. In addition, it demonstrated the suitability of using student subjects in similar experiments in the context of construction bidding. |
- About this
data sheet - Reference-ID
10576447 - Published on:
26/02/2021 - Last updated on:
26/02/2021