Influential factors for risk assessment and allocation on complex design-build infrastructure projects; the Texas experience
Author(s): |
Vassiliki Demetracopoulou
William J. O’Brien Nabeel Khwaja |
---|---|
Medium: | journal article |
Language(s): | English |
Published in: | Frontiers in Built Environment, February 2024, v. 10 |
DOI: | 10.3389/fbuil.2024.1330506 |
Abstract: |
The design-build (DB) delivery method is used to deliver increasingly complex transportation infrastructure projects associated with higher uncertainty. As such, allocating risks in the contract between the owner and design-builder becomes challenging and often leads to higher initial bids, increased contingency, or claims. Learnings from implementation worldwide have underlined the need for improving risk allocation in DB contracts. Most existing studies address risk allocation mechanisms to manage contingency at the contract level. Other studies have recognized the need for owners to adapt their processes to better allocate risks in DB contracts. This study explored the influential factors for risk assessment and allocation for complex DB infrastructure projects, addressing the opportunity to improve transportation owners’ risk allocation processes before the design-builder is selected and the DB contract is awarded. |
- About this
data sheet - Reference-ID
10789918 - Published on:
20/06/2024 - Last updated on:
20/06/2024